{"id":55966,"date":"2022-08-16T08:58:30","date_gmt":"2022-08-16T12:58:30","guid":{"rendered":"https:\/\/healthcaredesignmagazine.com\/?p=55966"},"modified":"2022-08-17T15:45:43","modified_gmt":"2022-08-17T19:45:43","slug":"chop-moves-forward-on-1-9b-patient-tower","status":"publish","type":"post","link":"https:\/\/healthcaredesignmagazine.com\/news\/chop-moves-forward-on-1-9b-patient-tower\/","title":{"rendered":"CHOP Moves Forward On $1.9B Patient Tower"},"content":{"rendered":"<p><a href=\"https:\/\/www.chop.edu\/\" target=\"_blank\" rel=\"noopener\">Children\u2019s Hospital of Philadelphia<\/a> (CHOP; Philadelphia) is planning a new inpatient tower on its main campus in Philadelphia, according to the <a href=\"https:\/\/phillyyimby.com\/category\/childrens-hospital-of-philadelphia\" target=\"_blank\" rel=\"noopener\">website<\/a> phillyyimby.com.<\/p>\n<p>The $1.9 billion, 1.4 million-square-foot facility is part of CHOP\u2019s $3.4 billion development plan. The new inpatient tower will house eight diagnostic and treatment floors; 12 inpatient floors with 40 beds per floor; a special delivery unit for babies requiring care before, during, and after delivery; as well as parking for approximately 200 cars. The design team aims to achieve LEED Silver certification.<\/p>\n<p>It is scheduled to open in early 2028.<\/p>\n<p>The project team includes <a href=\"https:\/\/ballinger.com\/\" target=\"_blank\" rel=\"noopener\">Ballinger<\/a> (designer; Philadelphia) and <a href=\"https:\/\/www.zgf.com\/\" target=\"_blank\" rel=\"noopener\">ZGF Architects<\/a> (consultant and interiors\/clinical architect; Portland, Ore.).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 1.4 million-square-foot project will house eight diagnostic and treatment floors and a special delivery unit for babies requiring care before, during, and after delivery.<\/p>\n","protected":false},"author":13604,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[526,527],"tags":[],"acf":[],"aioseo_notices":[],"parsely":{"version":"1.1.0","meta":{"@context":"https:\/\/schema.org","@type":"NewsArticle","headline":"CHOP Moves Forward On $1.9B Patient Tower","url":"http:\/\/healthcaredesignmagazine.com\/news\/chop-moves-forward-on-1-9b-patient-tower\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/healthcaredesignmagazine.com\/news\/chop-moves-forward-on-1-9b-patient-tower\/"},"thumbnailUrl":"","image":{"@type":"ImageObject","url":""},"articleSection":"Projects","author":[{"@type":"Person","name":"Tracey Walker"}],"creator":["Tracey Walker"],"publisher":{"@type":"Organization","name":"HCD Magazine","logo":""},"keywords":[],"dateCreated":"2022-08-16T12:58:30Z","datePublished":"2022-08-16T12:58:30Z","dateModified":"2022-08-17T19:45:43Z"},"rendered":"<script type=\"application\/ld+json\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"NewsArticle\",\"headline\":\"CHOP Moves Forward On $1.9B Patient Tower\",\"url\":\"http:\\\/\\\/healthcaredesignmagazine.com\\\/news\\\/chop-moves-forward-on-1-9b-patient-tower\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/healthcaredesignmagazine.com\\\/news\\\/chop-moves-forward-on-1-9b-patient-tower\\\/\"},\"thumbnailUrl\":\"\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"\"},\"articleSection\":\"Projects\",\"author\":[{\"@type\":\"Person\",\"name\":\"Tracey Walker\"}],\"creator\":[\"Tracey Walker\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"HCD Magazine\",\"logo\":\"\"},\"keywords\":[],\"dateCreated\":\"2022-08-16T12:58:30Z\",\"datePublished\":\"2022-08-16T12:58:30Z\",\"dateModified\":\"2022-08-17T19:45:43Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/healthcaredesignmagazine.com\/p.js"},"_links":{"self":[{"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/posts\/55966"}],"collection":[{"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/users\/13604"}],"replies":[{"embeddable":true,"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/comments?post=55966"}],"version-history":[{"count":5,"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/posts\/55966\/revisions"}],"predecessor-version":[{"id":55984,"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/posts\/55966\/revisions\/55984"}],"wp:attachment":[{"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/media?parent=55966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/categories?post=55966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/healthcaredesignmagazine.com\/wp-json\/wp\/v2\/tags?post=55966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}